Question for you guys regarding plumbing for Bassett thru transom water injected headers. What I'm thinking is run the water line (5/8&quot gate gave by the pump, tee into block where the water pump was. Have two dump lines (5/8&quot from the thermostat housing running back to the collectors and dumping in, and then using one of the coolant ports in the block under the thermostat housing, using a 90° threaded fitting, with water line (1/2&quot and a gate valve in the line before the basset ball spring tee and then to the injection lines. I do have water pressure gauge up on the intake manifold to keep an eye on pressure. Currently running logs and snails, no gate valve or pressure relief. See a few (2-3psi) wide open. Boat runs about 140-150° currently thanks