Joined
·
11,830 Posts
Here's some pics of the Patriot heads the second time around, with un finished seats, supposedly ready for a valve job.
Here's what I started with (after re-doing the guides). It's hard to see, but I think one of the problems on these is that the seats are installed with the tops below the floor of the chamber. The arrows show the lip around the chamber where they cut a small counterbore raduis.
This is after boring the intake throats to size and blending the chamber.
5 angle intake cut w/ bowl already blended
Here's what I started with (after re-doing the guides). It's hard to see, but I think one of the problems on these is that the seats are installed with the tops below the floor of the chamber. The arrows show the lip around the chamber where they cut a small counterbore raduis.

This is after boring the intake throats to size and blending the chamber.

5 angle intake cut w/ bowl already blended
